SAP – Knowledge Base

28 November 2008

CK11N – Create Material Cost Estimate – MATERIAL COSTING

Filed under: FICO, PP — admin @ 3:22 am
CK11N

E Create Material Cost Estimate;
G Anlegen Materialkalkulation;
Fr. Créer un CCR article;
Du. Artikelcalculatie creëren

Create Material Cost Estimate
You can check last cost for specific material with costing variant PPC3

26 November 2008

CA51 Task List Print List [ Print BoM & Routing ]

Filed under: Logistic, MM, PP — admin @ 1:49 am

Click the image to get sample on how to enter the field

Commonly Used Tcodes in PP Module Part 3

Filed under: PP — admin @ 12:29 am
Material Requirement Planning
Menu Nodes           TransactionActivity
Master Data          MD25       Create planning calendar
                     MD26       Change planning calendar
                     MD27       Display planning calendar
                     MDSA       Display BOM explosion number
                     MDSP       Edit BOM explosion number
                     MEQ1       Maintain quota file
                     OPPP       Explode BOM by date
                     MDUS       Display project assignment
                     MDUP       Process project assignment
                     MDL1       Create production lot
                     MDL2       Change production lot
                     MDL3       Display production lot
Planning             MD20       Create planning file entry
                     MD21       Display planning file entry
                     MDAB       Set up planning file entry in background
                     MDRE       Check planning file entry
                     MD01       Total planning online
                     MDBT       Total planning in background
                     MD03       Single-item, single-level planning
                     MD02       Single-item, multi-level planning
                     MD43       Interactive single-item planning
                     MD50       Multi-level, make-to-order planning
                     MD51       Multi-level project planning
                     MF52       Display planning table
                     MF50       Change planning table
                     MF57       Planning table by MRP lists
                     MF51       Planning table by production list
Evaluations          MD04       Stock/requirements list
                     MD07       Collective access of stock/requirements lis
                     MD05       MRP list
                     MD06       Collective access of MRP lists
                     MDLD       Print MRP list
                     MD45       Planning result
                     MD46       Collective access of planning result
                     MD44       Planning situation for a material
                     MD47       Planning situation for a product group
                     MD48       Cross-plant planning situation
                     MD4C       Order report
                     MD09       Pegged requirements
                     CO46       Order progress
Planned Order        MD11       Create planned order
                     MD12       Change planned order
                     MD13       Individual access of planned order
                     MD16       Collective access of planned orders
                     MD14       Individual conversion of planned order into
                     MD15       Collective conversion of planned orders int
                     MDUM       Convert planned order into purchase requisi
                     CO40       Convert individual planned order into produ
                     CO41       Collective conversion of planned orders int
                     CO48       Partial conversion of planned order into pr
                     COR7       Individual conversion of planned order into
                     COR7_PC    Collective conversion of planned orders int
                     COR8       Partial conversion of planned order into pr
                     MDVP       Collective availability check
                     MDAC       Execute action for planned order
LONG TERM PLANNING
PALNNING SCENARIO    MS31       CREATE
                     MS32       CHANGE
                     MS33       DISPLAY
PLANNING RUN         MS01       ON LINE
                     MSBT       SA BACKGROUND JOB
                     MS02       SINGLE ITEM - MULTI LEVEL
                     MS03       SINGLE ITEM - SINGLE LEVEL
                     MS50       SINGLE ITEM - SALES ORDER
                     MS51       SINGLE ITEM PLANNING, PROJECT
                     MFSO       PLANNING TABLE
EVALUTIONS           MS05       MRP LIST MATERIAL
                     MS06       MRP LIST COLLECTIVE DISPLAY
                     MSLD       PRINT MRP LIST
                     MS04       STOCK/REQUIREMENTS LIST
                     MS07       STOCK/REQUIREMENT LIST COLLECTIVE DISPLAY
                     MS44       PLANNING SITUATION MATERIAL
                     MS47       SITUATION PRODUCT GROUP
MPS-MASTER SCHEDULE ITEMS
TOTAL PLANNING       MD40       ON LINE
                     MDBS       SA BACKGROUND JOB
                     MD41       SINGLE ITEM - MULTI LEVEL
                     MD42       SINGLE ITEM - SINGLE LEVEL
                     MD43       SINGLE ITEM - INTERACTIVE
                     MD50       SINGLE ITEM - SALES ORDER
                     MD51       SINGLE ITEM PLANNING, PROJECT
*** EVALUTION IS SIMILAR TO MRP
PRODUCTION CONTROL
ORDER - CREATE       CO01       WITH MATERIAL
                     CO07       WITHOUT MATERIAL
                     CO40       FROM PLANNED ORDER
                     CO41       COLLECTIVE CONVERTION OF PLANNED ORDER
                     CO08       FOR SALES ORDER
                     CO10       FOR PROJECT
                     CO02       CHANGE
                     CO03       DISPLAY
CONTROL              MD04       STOCK/REQUIREMENTS LIST
                     COHV       MASS PROCESSING
                     COMAC      COLLECTIVE AVAILABILITY CHECK
                     CO05N      COLLECTIVE RELEASE
                     CO04N      PRINT
                     CO09       AVAILABILITY OVER VIEW
GOODS MOVEMENT       MF65       STOCK TRANSFER FOR RESERVATION
MATERIAL STAGING     MF68       LOG
                     MB1A       GOODS ISSUE
                     MB31       GOODS RECEIPT
                     COWBPACK   PACK MATERIAL
CONFIRMATION         CO1V       TIME TICKET
FOR OPERATION        CO14       DISPLAY
                     CO13       CANCEL
                     CO1L       REQUESTED CONFIRMATIONS
                     CO1P       PREDEFINED PROCESSES
TOOLS-ARCHIVING      CO78       ORDER
                     KOAA       SETTELMENT DOCUMENTS
CAPACITY PLANNING
EVALUTION            CM01       LOAD

WORK CENTER VIEW     CM02       ORDERS
                     CM03       POOL
                     CM04       BACKLOG
                     CM05       OVERLOAD
                     CM07       VARIABLE
EXTENDED EVALUTION   CM50       WORK CENTER VIEW
                     CM51       INDIVIDUAL CAPACITY VIEW
                     CM52       ORDER VIEW
LEVELLING            CM21       PLANNING TABLE (GRAPHICAL)
WORK CENTER VIEW     CM22       PLANNING TABLE (TABULAR)
INDIVIDUAL CAPACITY VCM27       PLANNING TABLE (GRAPHICAL)
                     CM28       PLANNING TABLE (TABULAR)
ORDER VIEW           CM31       PLANNING TABLE (GRAPHICAL)
                     CM32       PLANNING TABLE (TABULAR)
AVAILABLE CAPACITY   CR12       CHANGE
CAPACITY             CR13       DISPLAY
                     OP4A       SHIFT SEQUENCE
                     OP43       FACTORY CALENDER

Where shall we maintain number range for planned orders?

To maintain number range for planned order. Go to:
MM–>CBP–>NUMBER RANGE–>DEFINE NUMBER RANGE FOR PLANNING RUN.
Don’t allow External Number Assignment.

What is t.code for planning calendar and factory calendar?

Planning Calendar–MD25
Factory Calender–SCAL

Menu  Path
SPRO–>Materials Management–>Master Data–>Maintain Planning
SPRO–>Calendar–md25

SPRO–>General Settings–>Currencies–>Expiring Currencies–>Maintain
SPRO–>Calendar–>SCAL

Commonly Used Tcodes in PP Module Part 1

Filed under: PP — admin @ 12:28 am
MATERIAL
CREATE-GENERAL       MM01       IMMEDIETELY
                     MM11       SCHEDULE
CHANGE               MM02       IMMEDIETELY
                     MM12       SCHEDULE
                     MM13       ACTIVATE
FLAG FOR DELETION    MM06       IMMEDIETELY
                     MM16       SCHEDULE
DISPLAY              MM03       DISPLAY CURRENT
                     MM19       DISPLAY AT KEY DATE
DISPLAY CHANGES      MM04       ACTIVE CHANGES
                     MM14       SCHEDULE CHANGES
                     MM17       MASS MAINTENANCE
                     MMAM       CHANGE MATERIAL TYPE
OTHER                MMBE       STOCK OVERVIEW
                     MMPV       CLOSE PERIOD
                     MMRV       ALLOW POSTING TO
                                PREVIOUS PERIOD
                     MM50       INSTANT MATERIAL VIEW
                     MMSC       ENTER STORAGE LOCATIONS
                     MM60       MATERIAL LIST
ARCHIVING(MATERIAL)  MM71       ARCHIVE/DELETE
                     MM72       DISPLAY ARCHIVE
BILL OF MATERIAL (MATERIAL BOM)
                     CS01       CREATE
                     CS02       CHANGE
                     CS03       DISPLAY
EXTRAS               CS28       ARCHIVING
                     CS20       MASS CHANGES
EVALUATION/BOM       CS11       BOM MULTILEVEL
EXPLOSION/MATERIAL   CS12       STRUCTURE MULTILEVEL
BOM                  CS13       SUMMURISED BOM
WORK CENTRES
                     CR01       CREATE
                     CR02       CHANGE
                     CR03       DISPLAY
                     CA85       REPLACE
CAPACITY             CR11       CREATE
                     CR12       CHANGE
                     CR13       DISPLAY
HIERARCHY            CR21       CREATE
                     CR22       CHANGE
                     CR23       DISPLAY
LINE HIERARCHY       LDB1       CREATE
                     LDB2       CHANGE
                     LDB3       DISPLAY
REPORTING            CR60       W/C INFORMATION SYSTEM
                     CR05       W/C LIST
                     CR06       COST CENTRE ASSIGNMENT
                     CR07       W/C CAPACITIES
                     CR08       W/C HIERARCHY
WHERE USED           CA80       WORK CENTRE
                     CR15       CAPACITY
                     CR10       CHANGE DOCUMENTS
EXTRAS               CR09       STD. TEXTS TASK LIST
                     CR41       ARCHIVING
ROUTING
STAD. ROUTING        CA01       CREATE
                     CA02       CHANGE
                     CA03       DISPLAY
REF. OPERATION SETS  CA11       CREATE
                     CA12       CHANGE
                     CA13       DISPLAY
RATE ROUTING         CA21       CREATE
                     CA22       CHANGE
                     CA23       DISPLAY
REF. RATE ROUTING    CA31       CREATE
                     CA32       CHANGE
                     CA33       DISPLAY
EXTRAS               CA85       REPLACE W/C
MASS CHANGES         CA95       REPLACE REF. OP. SET
                     CA75       REPLACE PRT
DELETE TASK LIST     CA99       WITH ARCHIVING
                     CA98       W/O ARCHIVING
REPORTING            CA80       WORK CENTRE
WHERE USED LIST      CA90       REF. OP. SETS
                     CA70       PRODUCTION RESORCE TOOLS
COST CENTRE
                     OKKP       MAINTAIN CONTROLLING AREA
                     KS01       CREATE COST CENTRE
                     KZS2       CREATE COSTING SHEET
                     KA01       CREATE PRI. COST ELEMENT
                     KA06       CREATE SEC. COST ELEMENT
                     KL01       CREATE ACTIVITY TYPE
                     KP26       ACTIVITY TYPE/PRICE PLANNING

What is the T-Code for trigger point?

CO30     MENUCO30      Standard trigger points
CO31     SAPMCNSM     Create standard trigger point
CO32     SAPMCNSM     Change standard trigger point
CO33     SAPMCNSM     Display standard trigger point

What the tcodes to archieve/delete a material BOM? – by Jia

Look at this option to delete a material BOM

There are two ways of deleting BOMs:
- Using the Delete function.
- Using the Deletion indicator.

If you select the deletion indicator, the BOM is archived in the next reorganization run, and can be deleted if required. In the BOM header, you set the indicator that controls physical deletion after the archiving run. You can still process the BOM within its validity period.This also applies if the deletion indicator is entered with reference to a change number with a valid-from date that is after the date of the next reorganization run

You can use the below mentioned tcodes:
CS25/CS28        Archiving for BOMs
CS26                  BOM deletion
CS27                  Retrieval of BOMs

Commonly Used Tcodes in PP Module Part 2

Filed under: PP — admin @ 12:25 am
SALES AND OPERATIONS PLANNING
PRODUCT GROUP        MC84       CREATE
                     MC86       CHANGE
                     MC85       DISPLAY
GRAPHIC              MC91       PRODUCT GROUP
                     MC92       OVERVIEW
PLANNING             MC81       CREATE
FOR PRODUCT GROUP    MC82       CHANGE
                     MC83       DISPLAY
                     MC75       TRANSFER PG TO PLANNING
FOR MATERIAL         MC87       CREATE
                     MC88       CHANGE
                     MC89       DISPLAY
                     MC74       TRANSFER MATERIALS TO DM
                     MC9K       MATERIAL AVAILABILITY
VERSION MANAGEMENT   MC78       COPY
                     MC80       DELETE
FLEXIBLE PLANNING    MC93       CREATE
PLANNING             MC94       CHANGE
                     MC95       DISPLAY
                     MC9K       MATERIAL AVAILABILITY
TOOLS/PLANNING TYPE  MC8A       CREATE
MACRO                MC8B       CHANGE
                     MC8C       DISPLAY
EVENT                MC64       CREATE
                     MC65       CHANGE
                     MC66       DISPLAY
ROUGH CUT PLANNING   MC35       CREATE
PROFILE              MC36       CHANGE
                     MC37       DISPLAY
ENVIRONMENT          MC90       TRANSFER MATERIALS TO DM
ACTIVITY REQT.       KSPP       TRANSFER TO COST CENTRE
                     KSBL       COST CENTRE OLANNING REPORT
                     KSOP       TRANSFER TO ACTIVITY BASED COSTING
                     CPBL       PLANNING REPORT PROCESSES
                     MC9C       REPORTING
SETTINGS             MC96       FORECAST PROFILE
DISSAGGRIGATION      MC76       BREAKDOWN PG PLAN
                     MC77       DISPLAY PG PLAN
                     MC75       TRANSFER PG TO PLANNING
                     MC74       TRANSFER MATERIALS TO DM
FORECASTING
INDIVIDUAL FORECAST  MP30       EXECUTE
                     MP31       CHANGE
                     MP32       DISPLAY
TOTAL FORECAST       MP38       EXECUTE
                     MP33       REPROCESS
                     MP39       PRINT
                     MPBT       EXECUTE BACKGROUND
                     MPDR       PRINT BACKGROUND
DEMAND MANAGEMENT
PIR                  MD61       CREATE
                     MD62       CHANGE
                     MD63       DISPLAY
                     MD65       REQTS. FOR SCINARIO
                     MD66       COPY SIMULATED DEPENDENT REQT.
                     MD70       COPY TOTAL FORE CAST
EVALUATION           MD73       DISPLAY TOTAL REQT.
                     MD79       EXCELL INTERFACE
                     MD4C       ORDER REPORT
                     MD72       CHARECTERISTICS PLANNING
CUSTOMER REQT.       MD81       CREATE
                     MD82       CHANGE
                     MD83       DISPLAY
REPETITIVE MANUFACTURING
MASTER DATA          C223       PRODUCTION VERTION
PRODUCT COST PLANNING
COSTING RUN          CKMATSEL   CREATE
SELECTION LIST       CKMATCON   Edit
                     CK40N      EDIT COSTING RUN

SAP SOP – Sales, Operation and Planning (Info Structure S076)

Filed under: PP — admin @ 12:24 am

MC87 – Create Plan for Material (SOP is manage by version number)
MC88 – Change Plan – Click Inactive Version or hit the Enter key
MC89 – Display Plan

You should stop using MD61 and MD62 once you used SOP.

Let’s Create a Plan via MC87 :-

The system will prompt you the next available version number when you create a Plan. It can be overwritten as long as there are no existing records. (Version number can be a mixture of characters and numbers)

Always have the following settings :-
Settings -> 0
Settings -> Show row totals -> Historical periods

This two settings is done to ensure that there are no plan existing in the past.

Some of options you can used :-

You can define a target stock level. Enter a quantity in the Target Stock Level, then click Edit -> Create Production Plan -> Target Stock Level

Define a target days supply by entering a quantity in the Target days supply and clicking Edit -> Create Production Plan -> Target Days Supply

If you want to plan by week click Edit -> Period Splitting -> Total -> Days or Weeks or Months

You can have some plan in weeks, some in days. Select the periods columns you want to change, then click Edit -> Period Splitting -> Selective -> Days or Weeks or Months

You can have a block range periods columns value to be increased or decreased by a certain figure or percentage. Select the period columns and click Edit -> Distribute -> Fill in the Val. field and OP

After all the data is entered, you can then transferred it to Demand Management. Click Extra -> Transfer to Demand Management.

You’ll get a message “values only tranferred if saved. Saved planning values first?”. Click Yes.

Be aware that if you have maintained multiple versions, you should only transfer one version to demand management as each transferred version will overwrite the requirements of the older version.

Material :
Plant :
Version :

Transfer strategy and period
X – Production plan for material or PG members

From – Put the period from date or beginning of month
To – Leave it blank or put the date up to the confirm plan you want to transfer

Invisible transfer – If tick, it will display the planned independent requirements before saving it

Requirement Type – Depend on your planning strategy

Version – “00″ is requirement list

Active – Tick or your MRP will not show the PIR. Inactive means that the quantities are for information only.

To transfer, click the Transfer Now button or Edit -> Transfer Now

A warning message “Planning version to be transferred is not an active version” will be issue by the system. Just hit Enter.

The Transfer Planning Data to Demand Management screen (MD74) will be shown. Do not change anything in this screen as it will not be changed in SOP.

Save your data and you have successfully create a plan in SOP.

Some other transaction code in SOP :-

MC78 – Copying Planning Version. This is done when you want to retain the previous version.

MC80 – Delete Planning Version. Do this when you want to delete unwanted planning versions. Tick the version you want to delete and click the Delete button. An authorized user should perform this.

Please don’t delete A00 which is the SAP standard active version.

by: Shailesh

ME11 – Create Purchasing Info Record [ UoM ]

Filed under: MM, PP — admin @ 12:20 am
ME11

E Create Purchasing Info Record;
G Infosatz hinzufügen;
Fr. Ajouter fiche infos-achats;
Du. Inforecord toevoegen

Create Purchasing Info Record
note: If error occurs, Set UoM, try to exit and it will bring you to the right window and fill in what you are required

24 November 2008

Archiving the Material Master [Archive - Delete Material]

Filed under: Admin, MM — admin @ 10:26 pm

Transaction SARA contains all the SAP archiving objects for all the SAP R/3 applications modules.  All the SAP archive functions are shown in SARA.  Choose the corresponding SAP archive object, hit enter and the archive administration menu will be shown.  Provided here will be an example on how to archive the SAP Material Master.

Archive a Material Master Record

When a material is no longer required in a company or plant, you can archive and delete the material master record.

You have to Flag the material master record for deletion. This is known as logical deletion.

Before a material master record can be archived and deleted, other objects (such as purchasing documents) that refer to this material must themselves be archived. You can see which objects these are and the dependencies between them in the network graphic.

If a material master record cannot be archived and deleted at a given organizational level, the reason is given in the log (for example, a purchase order exists for the material). The log also contains technical data such as the number of material master records read and the number deleted.

Some of the archive error log message :-

  • Costing data exists
  • Use in routing
  • Use in sales and distribution
  • Use in bill of material
  • Delivery exists
  • Costing data exists
  • Info record exists
  • Purchase order exists

The Archiving steps :-

Archiving object MM_MATNR for archiving material master records.

You can display the archived data, but not reload it.

To archive the material master, first goto transaction MM71.

Type in a variant name and click Maintain.  (Tick the Test Mode for archive simulation).

Save the variant.

Maintain the Start date and Spool parameters and click execute.

Click Goto Job Overview to check the archive status.

To do a permanent delete, goto transaction SARA and click Delete button.

Maintain the Archive Selection, Start date and Spool parameters.

Click Test Session for testing or click execute to start the deletion program.

Click Goto Job Overview to check the delete status.

Now, if you goto MM02/MM03, you will not be able to find the record in the material master.

MKVZ – Looking for a Vendor in SAP [Vendor List]

Filed under: Admin, Logistic, MM — admin @ 10:22 pm

Transaction: MKVZ

You will need to look for the Vendor in SAP before you make your award. You can search by the Vendor Name or CAGE Code. If the Vendor is created but not yet available (extended) to GSFC, a request to extend the Vendor will have to be submitted. If there is no vendor, a request for a New Vendor will have to be submitted. Note the Account Group of the vendor you require will usually be KRED unless doing a Grant/Letter of Credit (LOC) [ZHHS] or Interagency (ZPAC); under no circumstance should you use a ZREM vendor. A vendor may be created but under the wrong Account Group. A request for a new Vendor with the appropriate group may be required.

To Search via Cage Code, enter Cage Code in the Search Term field, and enter the appropriate Account Group; then click the clock icon to execute search.

For advanced searches (such as Vendor Name), click on the Selection icon next to the Vendor field which will take you to the below searches:

19 November 2008

ME2* Transaction

Filed under: Logistic, PP, Stock — admin @ 2:13 am

Older Posts »

Powered by WordPress