CM29 – Capacity Leveling – Put Orders on Scheduling Systems

Filed under: PP — admin @ 6:27 am

Enter WorkCentre required

Enter Plant

Execute

Select top order number then scroll to bottom, Select first one (hold Ctrl button) then select the last one and then click ^ top arrow then save.

MD07 – Checking Production Order / Requirement

Filed under: PP — admin @ 6:16 am

Enter PLANT

Enter MRP Controller

ENTER – YES (waiting for system to scan all materials)

Go to EDIT- Find [Update status - Yes]

Click FIND MRP

Click Order + Order Rel + Plnd Order

Click on FIND MRP ELEMENTS

“Green Tick”

To run them down, click on first highlighted items then just next ’till ends.

when found one required production order, open md41 (new window) enter material -execute (2xenter)

back to md07, refresh, you will see new planned order – double click then follow just like co01 command

COOIS – SCHEDULE LIST – On Production

Filed under: PP — admin @ 6:08 am

Enter Production Plant

Enter System Status DLV and tick EXCL

Enter Range of Workcentre required (e.g. FPQCMP01 to FPRDWC01) – Plant (e.g. BP02) – System Status Range (Both CNF ticked)

Execute

You can also print them:

First arrange them on order; right click on order – sort them in ascending order

click black arrow : Select Layout (e.g. Simple) then export – local file – spreadsheet – define location to save the file

GENERATE

QM11 – Display List of Quality of Notifications (QN)

Filed under: Quality — admin @ 5:36 am

Tick STATUS required

Enter DATE selection

then execute

10 December 2009

CO02 – Production Order Change

Filed under: PP — admin @ 4:03 am

Enter Production Order Number.

= You can change anything needs to update

MD04 – Stock/Requirements List

Filed under: PP — admin @ 3:48 am

Enter Material

Enter MRP Area

Enter Plant

=> Execute

MD41 – RUN MRP SINGLE ITEM

Filed under: PP — admin @ 3:46 am

Enter Material

Enter MRP Area

Enter Plant

MD61 – Create Planned Independent Requirements

Filed under: PP — admin @ 3:41 am

Enter Material

Enter MRP Area

Enter Plant

and set your requirement

CO14 – Display Production Confirmation – Good Movement (Get Batch)

Filed under: PP — admin @ 3:30 am

Enter Order Number

Get Batch

Get Thread Batch (optional information on TEXT)

Get Other extra data