SAP – Knowledge Base

14 December 2009

COOIS – SCHEDULE LIST – On Production

Filed under: PP — admin @ 6:08 am

Enter Production Plant

Enter System Status DLV and tick EXCL

Enter Range of Workcentre required (e.g. FPQCMP01 to FPRDWC01) – Plant (e.g. BP02) – System Status Range (Both CNF ticked)

Execute

You can also print them:

First arrange them on order; right click on order – sort them in ascending order

click black arrow : Select Layout (e.g. Simple) then export – local file – spreadsheet – define location to save the file

GENERATE

No Comments »

No comments yet.

RSS feed for comments on this post. TrackBack URL

Leave a comment

You must be logged in to post a comment.

Powered by WordPress