SAP – Knowledge Base

10 December 2009

MD61 – Create Planned Independent Requirements

Filed under: PP — admin @ 3:41 am

Enter Material

Enter MRP Area

Enter Plant

and set your requirement

CO14 – Display Production Confirmation – Good Movement (Get Batch)

Filed under: PP — admin @ 3:30 am

Enter Order Number

Get Batch

Get Thread Batch (optional information on TEXT)

Get Other extra data

11 September 2009

ME57 – Assign and Process Purchase Requisitions

Filed under: PP, Stock — admin @ 1:56 am

Assign and Process Purchase Requisitions

-Check Purchase Requisition

-Convert PR to Purchase Order

NOTE: use ME52 – Delete purchase requisition item

3 September 2009

VA01 Create VA02 Edit VA03 Display Sales Order

Filed under: Sales — admin @ 2:03 am

VA01 = Create

VA02 = Edit

VA03 = Display

Sales Order

View order VA03 > Environment > Changes <- to check any changes

26 August 2009

VB11 Material Determination – Change Material Globally

Filed under: MM — admin @ 4:21 am

Step 1

Step 1

Enter

Step 2

Step 2

Save

If you want to check to see if it has been done already VB13

Step 3

Step 4

Click execute

Step 5

MB5T – Display Stock in Transit

Filed under: PP, Stock — admin @ 12:03 am

MB5T

Enter Receiving Plant to display what in Transit to that Plant

mb5t

3 August 2009

MSC1N – Create New Batch

Filed under: Admin, MM, PP, Stock — admin @ 2:45 am
SAP T-Code MSC1N
Create Batch
SAP Uses This Report to Generate MSC1N: SAPLCHRG
SAP T-Code Description: Create Batch
SAP T-Code: MSC1N

22 July 2009

VL06G List of Oubound Deliveries for Goods Issue

Filed under: Stock — admin @ 1:54 am
Enter required date and Execute

2 July 2009

MB56 – Analyze batch where-used list

Filed under: Uncategorized — admin @ 3:43 am
MB56

E Analyze batch where-used list;
G Chargenverwendungsnachweis auswerten;
Fr. Analyser le cas d’emploi des lots;
Du. Chargegebruiksinformatie evalueren

Analyze batch where-used list to specific production order
Enter Material Number
Enter Plant
Enter Batch (that you are looking for)
Select Bottom-Up Analysis
Click START ANALYSIS
it will show you the list of product that using that material with specific batch number

17 June 2009

CO48 – Breaking a planned order/production order into small lots

Filed under: PP, Sales — admin @ 11:49 pm

Breaking a planned order/production order into small lots

« Newer PostsOlder Posts »

Powered by WordPress